Services, site information, fees, and what to expect during design and permit review.

Scope

Services and scope

Do you draw house plans?

The focus is septic systems, plumbing, and HVAC. Floor plans, elevations, and the architectural permit set stay with your house designer, with the systems drawings coordinated alongside that work.

Do you work with my house designer?

Yes. SBG Design Works provides a defined systems package that supports your designer’s architectural work. Scope, drawing coordination, and communication are agreed at the start.

What qualifications cover the work?

Qualifications held are On-Site Sewage Systems, Plumbing for all buildings, and Building Services, which covers HVAC for houses and small buildings plus fire detection, lighting, and emergency power. Work above that scope is coordinated with a professional engineer.

Who signs the drawings?

Stephen Gilbert is the designer of record, with BCIN 513381 on each sheet. You have a direct point of contact for questions about the application and drawings.

Septic

Sewage systems and septic permits

Do I need a test pit before you can quote?

You can start the conversation with the lot information and building plans. The fee tier is confirmed once the soils information is available, before design begins. If a soils report is still needed, test pits are arranged as part of that preparation.

What if the lot is mostly rock?

Shallow soil and bedrock are familiar conditions in this district. Test pit information helps establish the suitable system options and the applicable fee tier before design begins.

Can you replace just the tank, or just the bed?

Yes. NBMCA permits tank-only and bed-only replacements. The application still needs the site plan and the flow calculation, because the reviewer has to confirm the part you're keeping still works with the part you're replacing.

How long does septic review take?

Review times are set by the approval authority and can vary with the season and application. The design process includes assembling the submission information and responding to the first review cycle. Ask about current timelines when discussing your project.

Who issues the septic permit for my lot?

In most of the Parry Sound and Nipissing districts it is the North Bay–Mattawa Conservation Authority, now through its North Bay office. Since May 1, 2026, Seguin, McDougall, Perry, Armour and McMurrich/Monteith issue their own sewage system permits, and the Township of the Archipelago always has. Drawings and application information are prepared for whichever office reviews your lot.

Do you install?

SBG Design Works provides design services. You engage a licensed installer, and the drawings and site questions can be coordinated with them. Local installer referrals are available if needed.

Working together

Fees, timing, and what you need to send

Why publish prices?

Published ranges help you budget before making an inquiry. The final fee depends on the building and site conditions and is confirmed in writing before work begins.

What does the fee not include?

NBMCA or municipal permit fees, test pit excavation, soils lab work where it's needed, and any professional engineer's review for work above BCIN scope. All of those are billed at cost or paid directly by you.

What if the reviewer asks for changes?

The first review cycle is part of the job. If the comments come from a change you've made to the project after the drawings were done, that's a revision, and the revision fee is on the rate card.

What should I have ready?

A survey, lot sketch, or roll number; floor plans if available; bedroom count; any soils report or test pit results; and whether a permit application is already underway. Send what you have, and we can identify any further information needed.

Next step

Tell us about your project.

Share the location and scope. You’ll receive a fixed quote and an agreed schedule before design begins.